Case Study
Fibre Links Between Buildings
A company in Killarney, needed to link 2 buildings which were 200 metres apart. In the past a wireless link provided the link, but trees had grown and made the link unusable. We worked with the company and the solution was to run a fibre link between the 2 buildings. Ducting was put in place and we ran the fibre cable in the ducting and linked up the networks at both buildings.